 170 - The initial large block of polystyrene is placed on a purpose-built screed-table (article in Fine scale modeler mag.Feb.2002), and covered in fibreglass. |
 171 - Additional coates of tinted fibreglass are added, and also aluminium rings. |
 172 - Rings are also made for under the roof opening, to give the correct profile for the cupola. |
 173 |
 174 - The hatch on the screed table, upside down. |
 175 - The hatch, right side up, and after final fibreglassing. |
 176 - Episcope covers shown stacked. |
 177 - The underneath of the cupola proves very tricky to replicate, especially the 7x openings for the episcopes, as they are of a differcult profile! |
 178 - Note the cut-out underneath for the hatch-lifting-arm. |
 179 |
 180 |
 181 |
 182 - The episcope covers in place. I lost count how many times I lifted the cupola up and had it temporarily installed upon the roof to check the fitting! |
 183 |
 184 - Shown is a temporary AA-rail, and hatch arm installed. |
 185 |
 186 |
 187 |
 188 - Note the small recesses underneath to house the rectangular-rubber seals that are fitted to each of the 7x episcopes. |
 189 |
 190 - The episcope covers, all sanded, primed and ready for final installation. |
 191 |
 192 - The covers in place, and initial weld beads added. Note the 2x tubes for the Kdr.s weather-shield, catch for the lock, and the 3x drainage-slots. |
 193 |
 194 - Top left is the hatch-stop, welded behind a cover. |
 195 - The hatch in the closed position. |
 196 - Underneath the Kdr.s hatch, with its black padded lining to protect his head while viewing through the episcopes with the hatch closed. |
 197 - Cupola again in temporary position. Note the lower track brackets in place, and the "original" track-link and top bracket!
|
 198 - To the left a mock-up of the proposed turret-bin, and in the foreground is the round cover for the "close-defence-weapon". |
 199 - The hatch arm assembly which I am currently working upon, showing the hatch in the open position.
|
 200 - All of the welds are again gone over and built-up to the correct original pattern. |
 201 |
 202 - All these components are still in the process of construction and refinement…..and it seems that as new details are learned, the work will continue!
|